whisby garden centre and play barn
June 2022
We were called to Whisby in June 2022 when another Lincoln Electrical Contractor couldn’t get the job finished on time! The play barn was having a huge mezzanine floor put in to give an extra 144 square meters of party area upstairs
I met with Jackie and the builder on site, and the newly formed “downstairs area” needed 40+ downlighters. Cables needed to be in within 2 days to stop any delays with the plastering work
The football play area also needed some lights










The new “upstairs” is being split into 5 party areas and each needed a log suspending above and custom downlights drilling and fitting into the logs
All the steel chains and support wires were hidden with fake ivy
We are now Whisby Garden Centres first call for all their electrical needs.
Recently, we fitted 4 new outside sockets for a new water feature display area